Commissioning
Mono Power Unit BUM 62 T 53
Baumüller Nürnberg GmbH 5.99009.03
7.3.1 Ready for operation
The message ”Ready for operation” is the most important message for you. If a monitoring function
generates a message which clears the ”Ready for operation” message, the production of your plant is
stopped in the worst case.
There is more than one ”Ready for operation” message. If, e.g. a V controller is included in the BUM 62
T, four different ”Ready for operation” messages can be displayed in a drive.
y ”Supply part ready” (available and visible in the BUM 62 T)
= ”Internal ready for operation” (digital output)
= "External ready for operation"(relay contacts)
y ”Supply part ready” (available in the BUM 62 T and not visible)
y ”Controller ready” (available in the controller)
y ”Completely ready” (available in the controller)
The message ”Completely ready” depends on the three other ”Ready” messages. The message
”Completely ready” is output only when the messages ”Supply part ready” and ”Power stage ready” and
”Controller ready” are output (see figure).
The following sections provide further information on the different ”Ready” messages.
NOTE
The drive is ready approx. 3.5 seconds after the +24V supply voltage and the mains voltage have been
applied.
”Power part ready” after approx. 0.5 s. ”Controller ready” after approx. 3 s

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Baumuller BUM 62 T and is the answer not in the manual?

Baumuller BUM 62 T Specifications

General IconGeneral
BrandBaumuller
ModelBUM 62 T
CategoryPortable Generator
LanguageEnglish

Related product manuals