11
3 Arrangement of instruments within the system
3.1 Front view
1) Signal lamp "SIM" on
2) Measuring range selector switch for mA meter
3) mA meter
4) Pull switch: Test / SSG
5) Pull switch: SA 32 / SSG
6) Low voltage input (e.g. audio frequency generator, ohmmeter etc.)
7) Mains connection 220V (240V), 50 / 60Hz or 110V (120V) 60Hz
8) Low voltage output
9) High voltage output max. 32kV (SSG + SA 32)
10) Earth clamp
2 3 4 5
7
8
9
10
1