CHAPTER
7-1
Cisco SCE 2000 4xGBE Installation and Configuration Guide
OL-7824-06
7
Basic SCE 2000 Platform Operations
This chapter describes how to start up the SCE 2000 platform, reboot, and shutdown. It also describes
how to manage configurations.
• Starting the SCE 2000 Platform
• Managing SCE 2000 Configurations
• How to Display the SCE Platform Version Information
• How to Display the SCE Platform Inventory
• How to Display the System Uptime
• Rebooting and Shutting Down the SCE Platform
Starting the SCE 2000 Platform
The procedures for starting the SCE 2000 platform are explained in the following sections:
• Checking Conditions Prior to System Startup
• Performing Complex Configurations
• Starting the System and Observing Initial Conditions
• Final Tests
Checking Conditions Prior to System Startup
Check the following conditions before you start your SCE 2000 platform:
• Both power supply units are installed and connected
• First-time startup at installation:
–
SCE 2000 platform connected to local console (CON port)
–
The console terminal is turned on and properly configured
• Subsequent startups
–
Line and Cascade interfaces are properly cabled (optional)
–
SCE 2000 platform is connected to at least one of the following types of management stations:
–
Direct connection to local console (CON port)