IM 915-13 • VISION - EXTENDED SIZES 40 www.DaikinApplied.com

Sorbent Ventilation
Technology
Please refer to CDI SVT manual provided with unit for
installation, operation, and maintenance related to Sorbent
Ventilation Technology.
 If the SVT exhaust air is ducted out of the building, it
is the responsibility of the eld to include booster fans
in the ductwork to properly exhaust the air during the
regeneration cycle.
 Provided exhaust hood(s) can be discarded for indoor
units. Properly connect ductwork in the eld to the
exhaust opening(s) on the SVT section.
 In instances where more than one module is being
applied, there is one main control box for line voltage
and control voltage connections. This box will contain
the controller and landing terminals for the control
connection wires from the building. If more than one
SVT module is being applied, section splits may be
present. If so, factory supplied wires will need to be
routed into the provided junction box on each SVT
module. Conduit routing will be provided for these
connections.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Daikin Vision and is the answer not in the manual?

Daikin Vision Specifications

General IconGeneral
BrandDaikin
ModelVision
CategoryAir Handlers
LanguageEnglish

Related product manuals