INSTALLATION
EATON BladeUPS
®
(12 kVA) User's Guide S 164201649 Rev 4www.eaton.com/powerquality
22
To install the parallel system input and output wiring:
1. Remove the five screws on the wireway access cover and retain. Remove the
cover and retain. See Figure 5.
Figure 5. Removing the Wireway Access Cover (Bottom Entry Rack Shown)
2. Bottom Entry Wiring only. Remove the eight screws on the wireway top cover and
retain. Slide the cover back and off the wireway and retain. See Figure 6.
Ferrite Assembly
(mounted)
Wireway Top
Cover
Figure 6. Removing the Wireway Top Cover