EasyManuals Logo
Home>Eaton>UPS>Powerware Series

Eaton Powerware Series User Manual

Eaton Powerware Series
120 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #60 background imageLoading...
Page #60 background image
INSTALLATION
EATON BladeUPS
®
(12 kVA) User's Guide S 164201649 Rev 4www.eaton.com/powerquality
52
11. If your rack has conductors for grounding or bonding of ungrounded metal parts,
connect the ground cable (not included) to the ground bonding screw. See
Figure 32 on page 43 for the location of the ground bonding screw.
12. You can install an optional REPO circuit that will shut down the entire
parallel-ready system using a single switch. See “Remote Emergency Power-off”
on page 83 to install the REPO switch before powering on the parallel-ready
system.
13. Connect the parallel input cord from the UPS to the BladeUPS Bar in the rack as
shown in Figure 37 on page 49.
Gently loop and twist the parallel input cord as shown to minimize stress on the
cord. The loop and twist for the cord may vary depending on configuration and
strain relief.
14. Continue to “Parallel System Initial Startup” on page 60.

Table of Contents

Other manuals for Eaton Powerware Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Eaton Powerware Series and is the answer not in the manual?

Eaton Powerware Series Specifications

General IconGeneral
BrandEaton
ModelPowerware Series
CategoryUPS
LanguageEnglish

Related product manuals