EasyManuals Logo
Home>Fujitsu>Air Conditioner>AUYG18LVLB

Fujitsu AUYG18LVLB User Manual

Fujitsu AUYG18LVLB
413 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #275 background imageLoading...
Page #275 background image
6. SYSTEM DESIGN
INSTALLATION3.
OUTDOOR UNIT3-1.
OPENING A KNOCKOUT HOLE
CAUTION
Be careful not to deform or scratch the panel while opening the knock out holes.
To protect the piping insulation after opening a knock out hole, remove any burrs from the edge of
the hole.
It is recommended to apply rust prevention paint to the edge of the hole.
Pipes can be connected from 4 directions, front, lateral side, rear side and bottom. (Fig. A)
When connecting at the bottom, remove the service panel and piping cover on the front of the
outdoor unit, and open the knock out hole provided at the bottom corner of the piping outlet.
It can be installed as shown on “Fig. B” cutting out the 2 slits as indicated on “Fig. C”. (When
cutting slits, use a steel saw.)
Service panel
Front Lateral Rear
Front
connection
Lateral
connection
Rear
connection
Bottom
connection
(No.1)
Fig. A
Bottom
connection
(No.2)
Slit
Slit
Fig. B Fig. C
- (06 - 27) -
SYSTEM
DESIGN
SYSTEM
DESIGN

Table of Contents

Other manuals for Fujitsu AUYG18LVLB

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu AUYG18LVLB and is the answer not in the manual?

Fujitsu AUYG18LVLB Specifications

General IconGeneral
BrandFujitsu
ModelAUYG18LVLB
CategoryAir Conditioner
LanguageEnglish

Related product manuals