EasyManuals Logo
Home>GE>Laboratory Equipment>AKTAprime plus

GE AKTAprime plus User Manual

GE AKTAprime plus
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #48 background imageLoading...
Page #48 background image
WARNING
Before disassembly, check that there is no pressure in the piping
system.
WARNING
After assembly, the piping system must be tested for leakage at
maximum pressure for continued protection against injury risks
due to fluid jets, burst pipes or explosive atmosphere.
5.6 Calibration
The table below lists the type and frequency of calibrations that can be done on the in-
strument. Refer to PrimeView user documentation and to the individual component User
Manuals and Instructions for descriptions of how to perform these calibrations. The
calibrations are performed from PrimeView by selecting System:Calibrate in System
Control.
How oftenComponent
Every day.pH monitor (if applicable)
When required.Pump (if applicable)
When required.Pressure reading
Only necessary if specific conductivity with high
accuracy is measured (Cond_Calib).
Cell constantConductivity
flow cell
Must be done when changing the conductivity
flow cell (Temp).
Temperature
Must be done when changing the conductivity
flow cell (Cond_Cell).
Entering a
new cell con-
stant
48 ÄKTAprime plus Operating Instructions 28-9597-89 AB
5 Maintenance
5.5 Disassembly and assembly of components and consumables

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE AKTAprime plus and is the answer not in the manual?

GE AKTAprime plus Specifications

General IconGeneral
BrandGE
ModelAKTAprime plus
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals