EasyManuals Logo
Home>GE>Medical Equipment>LOGIQ A1

GE LOGIQ A1 User Manual

GE LOGIQ A1
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
GE MEDICAL SYSTEMS LOGIQ A1 BASIC SERVICE MANUAL
REV 2 5176463-100
13
2-2 Installation
2-2-1 Overview
This section describes the steps to install LOGIQ A1.
2-2-2 Average installation time
It takes about 1 hour to install GE LOGIQ A1.
2-2-3 Checking the components
Check the device carefully when getting a new one, if there is hard up of parts, contact
through the way in the Chapter 1.
Warning:
Connect LOGIQ A1 to the right grounded power socket to avoid electrical
shock, do not use three-pin to two-pin commutator that will destroy the grounded safety.
Warning:
There is no spare parts of an apparatus for operator. Do not open the outer
frame or panel in order to avoid electrical shock. Only the service person can do the
servicing when there is some wrong with the device except supply socket.
Warning:
Make sure the back panel is well ventilated.
Warning:
Do not hurt the rubber of probe surface, using of damaged probe is
prohibited.
Warning:
Although the emissive ultrasound energy is in the prescriptive range, it is
better to avoid unnecessary ultrasound radiation.
2-2-4 Unpacking LOGIQ A1
1.
Snip the package cingulum around the box.
2.
Remove the adhesive tape.
3.
Open the paper box.
4.
Take out the User manual
,
probe box, ultrasound gel and power cord.
5.
Take the device out of the package.
6.
Wipe off the plastic bag around device.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ A1 and is the answer not in the manual?

GE LOGIQ A1 Specifications

General IconGeneral
BrandGE
ModelLOGIQ A1
CategoryMedical Equipment
LanguageEnglish

Related product manuals