Care and Maintenance
10-12 LOGIQ V3/V5/V5 Expert – Basic Service Manual
5726264-100 English Rev.8
10-6 System maintenance
10-6-1 Preliminary checks
The preliminary checks take about 15 minutes to perform. Refer
to the Ultrasound system user documentation whenever
necessary.
Table 10-5: System preliminary checks
Step Item Description
1. Ask and Listen Ask the customer if they have any problems or questions about the
equipment.
2. Paperwork Fill in the top of Ultrasound Inspection Certificate (see Figure 10-5 on
page 10-32). Record all probes and Ultrasound system options.
3. Power up • Turn the Ultrasound system power on and verify that all fans and
peripherals turn on.
• Watch the displays during power up to verify that no warning or error
messages are displayed.
• Where applicable, confirm that the battery is charged. If no AC Input
present, use the internal battery.
4. Probes Verify that the Ultrasound system properly recognizes all probes.
5. Displays Verify proper display on the monitor.
6. InSite Where applicable, for Warranty and Contract Customers only:
• Verify that InSite is functioning properly.
• Ensure two-way remote communications.
7. Diagnostics Optional.
8. Presets Backup all Customer Presets to an appropriate media.
9. Image Archive Back up the Image Archive onto appropriate media.