General Ultrasound system requirements
LOGIQ V3/V5/V5 Expert – Basic Service Manual 2-7
5726264-100 English Rev.8
2-2-3-4 Site circuit breaker
It is recommended that the branch circuit breaker for the
Ultrasound system be readily accessible.
2-2-3-5 Site power outlets
A dedicated AC power outlet must be within reach of the
Ultrasound system without extension cords. Other outlets
adequate for the external peripherals, medical and test
equipment needed to support this Ultrasound system must also
be present within 1 m (3.2 ft.) of the Ultrasound system.
Electrical installation must meet all current local, state, and
national electrical codes.
2-2-3-6 Unit power plug
If the Ultrasound system arrives without a power plug, or with
the wrong plug, you must contact your GE dealer or the
installation engineer must supply what is locally required.
CAUTION
POWER OUTAGE MAY OCCURE.
The LOGIQ V3/V5/V5 Expert requires a dedicated single
branch circuit. To avoid circuit overload and possible loss of
critical care equipment, make sure you DO NOT have any
other equipment operating on the same circuit.

Table of Contents

Other manuals for GE LOGIQ V3

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ V3 and is the answer not in the manual?

GE LOGIQ V3 Specifications

General IconGeneral
BrandGE
ModelLOGIQ V3
CategoryMedical Equipment
LanguageEnglish

Related product manuals