EasyManuals Logo
Home>geminox>Boiler>THR Series

geminox THR Series User Manual

geminox THR Series
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #29 background imageLoading...
Page #29 background image

9&200,66,21,1*
Before commissioning, the installer must :
- Check that the boiler is suitable for the gas used.
- Perform a leak check on the gas system.
- Carefully bleed the air from the gas line. If the
system is new, bleeding chases the air out of the
lines so that the boiler has a suitable fuel. Air in
the gas prevents ignition of the burner and with
trip of the safety device by the flame monitor unit.
This remark applies to a new system using natu-
ral gas and LPG. In the second case, the storage
tank should also be efficiently bled before com-
missioning.
$SSO\DOOGXHVDIHW\SUHFDXWLRQVIRU
YHQWLQJWKHJDVEOHHG
7KHJDVEOHHGDOVRUHPRYHVR[LGH
SDUWLFOHV UHVXOWLQJ IURP EUD]LQJ
IURPWKHSLSLQJ
- Check the flue gas outlet for leaks and free pas-
sage of the combustion products.
- Check that the system is filled with water,
P = 1.5 bar, radiators bled, valves open.
'RQRWDOORZWKHSUHVVXUHWRIDOOEH
ORZEDU
- Check that the electrical connection is correct:
230 V (+10 %, - 15 %), 50 Hz, polarities correct.
- Check that the condensate drain is connected.
- Check that the trap is filled with water.
When commissioning, the installer must check:
- Correct operation of the controller.
- Correct operation of the flame monitor.
- Setting of the burner for CO, CO
2
emissions.
 &200,66,21,1*
- Open the hand-operated valve on the gas supply.
- Switch on the main heating switch.
The regulator undergoes a self-test sequence,
displaying codes L, P, C, 6, and 5 in turn. The dis-
play then shows 9, and finally 0.
After a wait lasting a few seconds and if there is a
demand for heating, the boiler then starts an igni-
tion cycle. This demand depends on the boiler
settings (refer to operating details for the different
versions (§ 2 - III - OPERATION)).
If the boiler is currently in an alarm state, press
the manual reset button. (If this alarm persists, re-
fer to the list of fault codes).
- Burner adjustment: this is factory preset for Natu-
ral Gas type H (G20) or Propane (G31) depend-
ing on model. However, the following checks
should be carried out when commissioning (the
burner should be on; see burner port description
and comments, fig. 11 § 5 - III - OPERATION).
23(5$7,1*35(6685(&+(&.
3
= Natural Gas H (G20) - 20 mbar, mains pres-
sure; Propane (G31) 37 mbar,
3
= Gas pressure controlled by air pressure
3/ = Servo-air pressure (Pa) (burner - gas valve)
!
!

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the geminox THR Series and is the answer not in the manual?

geminox THR Series Specifications

General IconGeneral
Brandgeminox
ModelTHR Series
CategoryBoiler
LanguageEnglish

Related product manuals