Maintenance and inspection procedures
Electrical inspection
4
Lucea 50_100
01740 EN 01
25 / 44
4.4.2 Checks
Fig.30: Lubricating the suspension
Lubricating the suspension under the slip
ring
1. Remove the mounting screw.
2. Raise the screw cover.
3. Spray lubricating grease at the location of
the screw cover.
Fig.31: Lubricating the spring arm
Lubricating the spring arm under the slip
ring
1. Remove the mounting screw.
2. Raise the screw cover.
3. Spray lubricating grease at the location of
the screw cover.
4.5 Electrical inspection
Ceiling-mounted power supply output voltage (24V)
Mobile and wall-mounted power supply output voltage (28 V)
Check the tightening of the wires in the terminal blocks
Check that the power supply is connected to earth.
Check the condition of the batteries (swelling, oxidised terminals, etc.)
Check the battery voltage.

Other manuals for Getinge Lucea 100

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Getinge Lucea 100 and is the answer not in the manual?

Getinge Lucea 100 Specifications

General IconGeneral
BrandGetinge
ModelLucea 100
CategoryMedical Equipment
LanguageEnglish

Related product manuals