EasyManuals Logo
Home>Getinge>Medical Equipment>Lucea 100

Getinge Lucea 100 Maintenance Manual

Getinge Lucea 100
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #30 background imageLoading...
Page #30 background image
4
Maintenance and inspection procedures
Hydraulic inspections
30 / 44
Lucea 50_100
01740 EN 01
Check Mains LED 1 Battery LED 2 LEDs3 to8 3 Meaning
After 1 hour
(LCA50) or 4
hours (LCA100)
Off Yellow One of LEDs
3to8 is lit (bat-
tery charge level)
Operation on bat-
teries
Connect the
power outlet
Green Off Scrolling LEDs Batteries char-
ging
Tab.7: Battery lifetime test
4.5.2 Visual inspections
1
2
Fig.39: Remote control
Remote control (option)
1. Check that the remote control operates
correctly.
2. Check the state of the batteries.
3. Check the lighthead selection function.
The video camera compatible with the
LUCEA100 lightheads is no longer available
since January2019.
Fig.40: Power lead for mobile version
Power lead (mobile version only)
1. Check that the power lead is not dam-
aged.
2. Check that the IEC mains connector on
the power supply enclosure cover is cor-
rectly connected
4.6 Hydraulic inspections
Not applicable to this product

Other manuals for Getinge Lucea 100

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Getinge Lucea 100 and is the answer not in the manual?

Getinge Lucea 100 Specifications

General IconGeneral
BrandGetinge
ModelLucea 100
CategoryMedical Equipment
LanguageEnglish

Related product manuals