14
04 Check and Storage
User Manual V1.0-2022-01-17
4 Check and Storage
4.1 Check Before Receiving
Check the following items before receiving the product.
1. Check the outer packing box for damage, such as holes, cracks, deformation, and others
signs of equipment damage. Do not unpack the package and contact the supplier as soon as
possible if any damage is found.
2. Check the inverter model. If the inverter model is not what you requested, do not unpack the
product and contact the supplier.
3. Check the deliverables for correct model, complete contents, and intact appearance. Contact
the supplier as soon as possible if any damage is found.
4.2 Deliverables
Inverter X 1
PV Box*N
PV Box
Bracket*N
Positive PV
Connector X N
Negative PV
ConnectorX N
PE OT
Terminal X 1
Cross
Screwdriver X N
Screw X NCommunication
Connector X N
AC PIN
Terminal X N
Mounting
Bracket X N
AC Connector
X N
Communication
Module X N
Expansion
Bolt X N
PIN Terminal
X N
Documentation
X 1
AC Connector
X N
Mounting
Bracket X N
AC cable OT
Terminal X N