EasyManuals Logo
Home>Gree>Inverter>GMV5

Gree GMV5 Service Manual

Gree GMV5
321 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #118 background imageLoading...
Page #118 background image
GREE Photovoltaic Direct-driven Inverter Multi VRF Units
114
LED1
LED2
LED3
Parameter Code
Display Mode
Parameter Code
Display Mode
Parameter Code
Display Mode
nb
On
Pc
Blinking
-n
Blinking
LED1
LED2
LED3
Parameter Code
Display Mode
Parameter Code
Display Mode
Parameter Code
Display Mode
N1
On
M0
On
12
On
LED1
LED2
LED3
Parameter Code
Display Mode
Parameter Code
Display Mode
Parameter Code
Display Mode
81
On
50
On
06
On
LED1
LED2
LED3
Parameter Code
Display Mode
Parameter Code
Display Mode
Parameter Code
Display Mode
7X
On/Off
XX
Off
XX
Off
If a parameter is invalid for the unit, "00" is displayed.
On the master unit, press "SW6" to return to the upper level if there are two levels of menu. Press
"SW4" to quit the query status.
If no button operations are performed on the master unit for five minutes, the function setting
automatically quits and the unit restores the current status.
Step 4: In query status, press "SW4" to quit.
1.3.5. Basic Operations for Engineering Commissioning
1.3.5.1 Basic Operations
Basic Operations
Operation Method
Remark
Starting engineering
commissioning
Press and hold "SW7" on the master
unit for more than five seconds.
——
Selecting no-wired-controller
commissioning mode
Press "SW4" and "SW5" simultaneously
in any commissioning progress after the
unit enters the commissioning status.
In this mode, the system does not detect the
communication status between the IDU and
wired controller any more. Commissioning can
be performed on the IDU without configuring
the wired controller.
Quitting engineering
commissioning
In engineering commissioning status,
press and hold "SW7" for more than five
seconds on the master unit to quit
commissioning.
——
Pausing engineering
commissioning
In engineering commissioning status,
press "SW6" on the master unit to retain
the previous commissioning completion
phase of the current commissioning
phase.
This function is valid after step 9. For example,
if receiving a pausing engineering
commissioning signal during the process of
"10. Pre-startup ODU valve status judging
phase" in step 11, the system will restore the
completion phase of "9.
Pre-startup refrigerant
judging phase" in step 10.
Continuing engineering
commissioning
In engineering commissioning pause
status, press "SW6" on the master unit
to continue engineering commissioning.
——

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gree GMV5 and is the answer not in the manual?

Gree GMV5 Specifications

General IconGeneral
BrandGree
ModelGMV5
CategoryInverter
LanguageEnglish

Related product manuals