Shenzhen Growatt New Energy CO.,Ltd
2
About this Document
This document describes the installation, electrical connection, operation, commission,
maintenance and troubleshooting of AXE 5.0L-C1 Battery System (hereafter simply put AXE 5.0L).
Before installing and operating AXE 5.0L, ensure that you are familiar with product features,
functions, and safety precautions provided in this document.
Indicates a potentially hazardous situation, if not avoided, could
result in serious injury or death.