OPERATION
65
AC PARALLEL OPERATION
Before connecting an appliance to either generator, make sure that the
appliance is in good working order and that its electrical rating does not exceed
that of the receptacle.
Most motorized appliances require more than their electrical rating for startup.
When an electric motor is started, the OVERLOAD ALARM indicator (red) may
come ON. This is normal if the OVERLOAD ALARM indicator (red) goes OFF
within 5 seconds. If the OVERLOAD ALARM indicator (red) stays ON, consult your
generator dealer.
During parallel operation, the Eco Throttle switch should be in the same
position on both generators.
1. Install the parallel kit on the frame of one generator.
Connect the parallel operation cable between two EU7000is generators
following the instructions supplied with the parallel kit.
2. Set the voltage selector switch of both generators to 120 V/240 V.
PARALLEL KIT
(optional equipment)
VOLTAGE SELECTOR SWITCH
120 V/240 V
31Z376200.book 65 ページ 2020年2月14日 金曜日 午前10時39分