Standard Operation Process
Document No. : Hawking FA disassembly SOP Station:
Process Name : Ver. : Date :
Fixture list(fixture specifications) Qty Fixture list(fixture specifications) Qty
Step:
Department:Tabulator:
Ya Zhu
IE
10(2/2)
1.00
Pic 1
Catch hinge up screw
1.Catch Hinge UP, disassemble hinge
screw M2.5x6(6052A0029201)*4.5
2.Disassemble Hinge screw with
MBM2X3.5( 6052A0051101)
❖ Torque :3.0 ± 0.3 Kgf.cm
❖ Screw can’t loosen,can’t drop in
machine 。
❖ Disassemble order:1 → 2 → 3 → 4
2018/03/12
Electric
screwdriver
1
1
2
Pic 2
1
2