Standard Operation Process
Document No. : Hawking FA disassembly SOP Station:
Process Name : Ver. : Date :
Fixture list(fixture specifications) Qty Fixture list(fixture specifications) Qty
Step:
Department:Tabulator:
Ya Zhu
IE
14(1/2)
1.00
Disassemble MB
1.Disassemble the screw of MB M2x2
(6052B0156201)*3,Follow order 1-3.
2.Disassemble the screw of MB
M2x3.5(6052A0 051101)*1, number 4
❖ Screwdriver bit : #1
❖ Torque:1.5 ± 0.3Kgf.cm
❖Screw can’t loosen and can’t drop into
the machine
❖Disassemble order 1→2→3→4
1
4
3
2
2018/03/12
Torque 1