Standard Operation Process
Document No. : Hawking FA disassembly SOP Station:
Process Name : Ver. : Date :
Fixture list(fixture specifications) Qty Fixture list(fixture specifications) Qty
Step:
Department:Tabulator:
Ya Zhu
IE
12(2/2)
1.00
取DC-IN CNTR&Fan CNTR
1.Pull out the DC cable from DC-IN CNTR,
2.Pull out Fan wire from CNTR.
2018/03/12