1 Work lead
2 CNC connection cable (EtherCAT shown)
3 Controller area network (CAN) cable
4 Power cable (120 VAC)
5 Coolant hose set (1 supply, 1 return)
6 Pilot arc lead
7 Negative lead (2/0 or 4/0)
8 Pilot arc and coolant hose set assembly
a Pilot arc lead
b Coolant hose set (1 supply, 1 return)
9 Power, CAN, 3-gas assembly
c Power cable (120 VAC)
d CAN cable
e 3 gas hoses (Core)
10 Torch lead
11 Hoses for supply gases
* Regulator
Position a gas regulator within 3 meters (10 feet)
of the gas connect console or take actions to
adjust inlet gas pressures to tolerances specified
in the process gas requirements.