EasyManuals Logo
Home>IBM>Server>8408-E8E

IBM 8408-E8E Installing

IBM 8408-E8E
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #18 background imageLoading...
Page #18 background image
v The Directory of worldwide contacts website http://www.ibm.com/planetwide. Select your
location to view the service and support contact information.
Attaching the lift handles to the chassis
Attach the four lift handles to the chassis so that three people can lift the chassis onto the mounting
hardware.
To attach the lift handles to the chassis, complete the following steps:
1. Depress the latches on each side of the handle (A) using your thumb and index finger.
2. Align the holes in the lift handles with the six pins on the chassis, and then lift the handle up (B),
until the latches click into place.
3. Repeat these steps for all four lift handles.
Installing the server into a rack
You must remove components within the system chassis so that three people can lift it into the rack.
Install the mounting hardware first, then remove components from the system chassis, and then lift the
chassis into place.
Remove the following components from the front of the system chassis:
v System fans
v Front bezel
v Disk drive backplane
Remove the following components from the rear of the system:
v Power supplies
Figure 1. Installing the lift handles
2 Power Systems: Installing the IBM Power System E850C (8408-44E)

Table of Contents

Other manuals for IBM 8408-E8E

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM 8408-E8E and is the answer not in the manual?

IBM 8408-E8E Specifications

General IconGeneral
BrandIBM
Model8408-E8E
CategoryServer
LanguageEnglish

Related product manuals