EasyManuals Logo
Home>IBM>Server>Power System 5148-22L

IBM Power System 5148-22L User Manual

IBM Power System 5148-22L
204 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #65 background imageLoading...
Page #65 background image
11. Lock the drive by rotating the bay handle (A) in the direction that is shown in Figure 46.
12. If you are installing more than one drive, repeat the steps in this procedure until all drives are
installed.
Preparing the 5148-21L, 5148-22L, 8247-21L, 8247-22L, 8284-21A, or 8284-22A
system for operation after removing and replacing a drive with the power turned
off
Learn to prepare the system for operation after you replace a disk drive or solid-state drive (SSD) in the
system with the system power turned off.
To prepare the system for operation, complete the following steps:
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is
connected to an unpainted metal surface. If not, do so now.
2. Reconnect the power cords to the system. For instructions, see “Connecting the power cords to the
system” on page 145.
3. If applicable, cover the SSD cage with the perforated plate (A) as shown in Figure 47 on page 48.
P8HAL507-2
A
Figure 46. Replacing an SSD in an expanded function system
Disk drives or solid-state drives 47

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM Power System 5148-22L and is the answer not in the manual?

IBM Power System 5148-22L Specifications

General IconGeneral
BrandIBM
ModelPower System 5148-22L
CategoryServer
LanguageEnglish

Related product manuals