21. On the console, press Enter to indicate that you installed the drive.
22. If you are replacing more than one drive, repeat the steps in this procedure until all drives are
replaced.
Preparing the 8284-21A or 8284-22A system for operation after removing and
replacing a drive with the power turned on in IBM i
Learn to prepare the system for operation after you replace a disk drive or solid-state drive (SSD) in a
system with the IBM i operating system or IBM i logical partition that controls the drive location
powered on.
To prepare the system for operation, complete the following steps:
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is
connected to an unpainted metal surface. If not, do so now.
2. If you replaced a drive and have not verified the drive yet, verify that the power LED is ON (green)
and the amber fault LED is OFF (not lit) for the replaced drive on the front of the system.
3. If applicable, cover the SSD cage with the perforated plate (A) as shown in Figure 69 on page 71.
P8HAL507-2
A
Figure 68. Replacing an SSD in an expanded function system
70 Disk drives or solid-state drives

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM Power System 5148-22L and is the answer not in the manual?

IBM Power System 5148-22L Specifications

General IconGeneral
BrandIBM
ModelPower System 5148-22L