Figure 15. Removing the BPM
j) Place the BPM on an appropriate ESD surface.
k) If you have a second BPM, repeat steps “4.b” on page 9 through “4.j” on page 16 for the other
BPM and BPM cables.
5. Label and remove the drives that are inside the system, if present. Otherwise, continue to the next
step.
a) Open the drive holder (A) as shown in Figure 16 on page 17.
16
Power Systems: Power Systems: Drive backplane