EasyManuals Logo
Home>IBM>Server>Power System 9009-22G

IBM Power System 9009-22G User Manual

IBM Power System 9009-22G
112 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #75 background imageLoading...
Page #75 background image
Figure 58. Replacing the front drives and llers
7. Replace the air baffles. For instructions, see Replacing the air baffle (www.ibm.com/support/
knowledgecenter/POWER9/p9haj/p9haj_922_airbafflereplace.htm).
Preparing the 9009-22G system for operation after removing and replacing the NVMe
drive backplane
To prepare the system for operation after removing and replacing the NVMe drive backplane, complete
the steps in this procedure.
Procedure
1. Slide the service access cover (A) onto the system unit.
2. Close the release latch (B) by pushing it in the direction shown.
Drive backplanes for the 5105-22E, 9008-22L, 9009-22A, 9009-22G, or 9223-22H
61

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM Power System 9009-22G and is the answer not in the manual?

IBM Power System 9009-22G Specifications

General IconGeneral
BrandIBM
ModelPower System 9009-22G
CategoryServer
LanguageEnglish

Related product manuals