TM 10-7360-226-13&P
CONTAINERIZED KITCHEN (CK) 0011 00
TROUBLESHOOTING PROCEDURES (MODERN BURNER UNIT)
0011 00-1
THIS WORK PACKAGE COVERS:
Modern Burner Unit (MBU)
INITIAL SETUP:
CK set up
Maintenance Level
Operator/Crew
MODERN BURNER UNIT (MBU) MALFUNCTIONS
Table 1. Troubleshooting Procedures (MBU)
Malfunction Test or Inspection Corrective Action
MBU does not power up No power to any MBUs Ensure MBU Power switch (next
to spice rack) is ON
Ensure MBU converter is ON
(front wall inside mechanical
room)
Ensure MBU converter is plugged
in (mechanical room)
Ensure 24 VDC is properly
connected from the converter to
the MBUs
Notify unit maintenance
Power available to all but one MBU Ensure power cable to affected
MBU is properly connected
Swap MBU with another unit to
determine if the problem is in the
MBU or power cable
Refer to TM 10-7310-281-13&P
for additional troubleshooting
guidance for the MBU
Notify unit maintenance
MBU powers on but does
not start
Check low fuel light on MBU Refuel MBU