EasyManua.ls Logo

Immergas VICTRIX 50 - Heating Phase Operating Sequence

Immergas VICTRIX 50
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
36
STV50 ed 09/08 VICTRIX 50 Rev. 002
VICTRIX 50 operating sequence.
Heating phase.
Power on
Main switch ON
Powering the circulator
e integrated board powers the boiler circulator
Burner ignition (automatic slow ignition)
e integrated board keeps the fan working at ignition speed
Flame detection
By means of the ionisation electrode the control unit detects burner ignition and sends the signal to this eect to
the modulating control board
Room thermostat switch closing
A room thermostat request shows conditions that require the central heating function
Boiler working
e burner works at a power that varies according to the type of request, to the adjustments/settings made and to the temperatures
detected by the NTC sensors.
Integrated board operation enabled
Closing of the main switch contacts (ON position) enables operation in the central heating mode
System pressure micro switch closing
Pressure in the primary circuit higher than the minimum shut-o value causes the pressure switch micro contact to close
Powering the fan
e integrated board powers the fan and manages its speed
Powering the ignition electrodes
When the fan reaches the speed in the ignition phase, the integrated board powers the ignition electrodes
Powering the gas valve coils
e integrated board powers the gas valve coils
Safety thermostat switch closing and ue thermostat
Closing of the safety thermostat contacts and ue thermostat enables the boiler to work
Technical DocumentationTechnical Documentation

Other manuals for Immergas VICTRIX 50

Related product manuals