2.1 Verifying the Shipment
Unpack the box and check the contents before operating the instrument. If
wrong items have been delivered, if items are missing, or if there is a defect with
the appearance of the items, contact the dealer from which you purchased the
instrument immediately.
Table 2–1 Package box contents
Item
Qty.
Model Remarks
Bi-
directional
programma-
ble DC
power
supply
- IT-M3400
series
This series include:1.8 Models and
Options.
Power Cord X 1 - User may select an appropriate power
cord that matches the specifications of
power socket used in the area. See the
Section 2.4 Connecting the Power Cordfor
details.
Multiple
instruments
connection
cables
X 1 - When the user needs to connect the
System Bus interfaces between Multiple
instruments in parallel operation,
multichannel operation and synchronized
operation features, this option is the right
choice.
Ex-Factory
Test Report
X 1 - It is the test report of the instrument before
delivery.