Acceptance and Installation
Copyright © Itech Electronics Co., Ltd. 1
Chapter1 Acceptance and Installation
Power supply is a high level safety equipment, there is a protected ground
terminal.Before Installation or operation, please read the safety signs and
instructions in this manual.
1.1 Confirm package contents
Open the package and check the articles within package box before operation.
In case of any non-conformity, missing or appearance wearing, please contact
ITECH immediately.
The package box should comprise:
IT7321/IT7322/IT7322H/IT7324/
IT-E172/
IT-E173/
IT-E174
The User may select different
power cords based on local outlet
specification. For detailed
specifications, refer to 1.3
Installation of power cord.
CD x1 - Comprising user manual and
documents related to
programming and grammatic
Test report before delivery
NOTE
After confirming that package contents are consistent and correct, please appropriately
keep package box and related contents. The package requirements should be met when
the instrument is returned to factory for repair.
1.2 Installation Position
The instrument should be installed at well-ventilated and rational-sized space.
Please select appropriate space for installation based on the power supply size