EasyManuals Logo
Home>jcb>Excavators>8035 ZTS

jcb 8035 ZTS User Manual

jcb 8035 ZTS
332 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #172 background imageLoading...
Page #172 background image
Operation
Lifting a Machine
154 154
9811/9950-1
Lifting a Machine
P11-2009
!MCAUTION
Do not lift the machine by the extended dozer (if fitted),
remove the extensions before lifting. Ensure the lifting
slings do not interfere with the top of the cab,
damaging the top glazing. It may be necessary to
remove the FOGS guard (if fitted).
8-2-9-24
Carry out the following procedure when lifting a machine:
1 Remove all attachments.
2 Remove all loose equipment from machine exterior.
3 Check the unladen weight of the machine. Refer to
Static Dimensions (SPECIFICATIONS section).
!MWARNING
Lifting Equipment
You can be injured if you use faulty lifting equipment.
Make sure that lifting equipment is in good condition.
Make sure that lifting tackle complies with all local
regulations and is suitable for the job. Make sure that
lifting equipment is strong enough for the job.
INT-1-3-7
4 Attach lifting equipment to each end of the dozer
blade at points A.
5 Attach lifting equipment to each side of the boom at
points B.
6 Take the weight of the machine. Ensure the slings do
not interfere with the cab. It may be necessary to use
a spacer bar between the slings at C.
HE Services

Table of Contents

Other manuals for jcb 8035 ZTS

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the jcb 8035 ZTS and is the answer not in the manual?

jcb 8035 ZTS Specifications

General IconGeneral
Brandjcb
Model8035 ZTS
CategoryExcavators
LanguageEnglish

Related product manuals