EasyManuals Logo
Home>Keithley>Measuring Instruments>2500

Keithley 2500 Service Manual

Keithley 2500
121 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #18 background imageLoading...
Page #18 background image
Model 2500 Service Manual Performance Verification 1-3
Warm-up period
Allow the Model 2500 to warm up for at least one hour before conducting the verification
procedures.
If the instrument has been subjected to temperature extremes (those outside the ranges
stated above), allow additional time for the instrument’s internal temperature to stabilize.
Typically, allow one extra hour to stabilize a unit that is 50°F (10°C) outside the specified
temperature range.
Allow the test equipment to warm up for the minimum time specified by the manufacturer.
Line power
The Model 2500 requires a line voltage of 100V / 120V / 200V / 240V (depending on rear
panel line frequency setting) and a line frequency of 50 or 60Hz. Verification tests must be
performed within this range. Make sure the line voltage setting seen through the small
window in the rear panel power module is at the required setting. If not, change the setting
as covered in Section 3.

Table of Contents

Other manuals for Keithley 2500

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Keithley 2500 and is the answer not in the manual?

Keithley 2500 Specifications

General IconGeneral
BrandKeithley
Model2500
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals