80 TP-6694 9/20
3.3 Service Schedule
Flexible lines and connections
Refer to engine operation
manual.
Tank vents and return lines for obstructions
Refer to engine operation
manual.
Air cleaner to room/enclosure
Flexible hoses and connectors
Coolant temperature protection level
Louver motors and controls
Water supply to heat exchanger
Battery charger operation, charge rate
Battery electrolyte level
Battery specific gravity, charge state
Recharge after engine start
Remove corrosion, clean and dry battery
and rack
Clean and tighten battery terminals
Tighten DC electrical connections
● Follow procedures and frequencies indicated in the engine manufacturer’s maintenance manual.
If not indicated, follow this service schedule. Some items may not apply to all generator sets.
R Replace as necessary.
X Action
* Service more frequently if operated in dusty areas.