14
Copper supply and return piping must NOT be installed di-
rectly into aluminum boiler section casings due to galvanic
corrosion between dissimilar metals. Iron or steel bushings
or pipe nipples should be used between copper system pip-
ing and boiler to make nal connection to boiler. Also, the
use of dielectric unions is acceptable. e packaged boiler is
furnished with iron piping in the front boiler section for the
supply and return connections.
When the installation of the boiler is for a new heating system,
rst install all of the radiation units (panels, radiators, base-
board, or tubing) and the supply and return mains. Aer all
heating system piping and components have been installed,
make nal connection of the system piping to the boiler. A hot
water boiler installed above radiation level must be equipped
with a low water cut o device. A periodic inspection is neces-
sary us is ushing of oat type devices, per low water cut o
manufacturers specic instructions.

e packaged boiler unit is set up to receive 1
¼” NPT supply
and return piping from top access. e boiler unit can also
be piped from the le side by turning the supply elbow, and
from the rear of the unit by removing plugs in the rear boiler
section.
NOTE: e circulator pump and isolation valves are fur-
nished within a carton inside the boiler cabinet and can be
installed at the installer preferred location.

CAUTION
!

e boiler should be placed to provide the most direct connec-
tions to the combustion air, vent and system piping as possible.
Place crated boiler as close to selected location as possible and
uncrate boiler. e uncrated boiler may be moved into position
with an appliance dolly or 2-wheel hand truck. e dolly or
hand truck should be inserted under the le hand side of the
boiler. It is possible to slide the boiler for a short distance on a
smooth oor or surface.
Note: refer to manual section “locating the boiler” for
required clearances for servicing and maintenance.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lennox GWB9 and is the answer not in the manual?

Lennox GWB9 Specifications

General IconGeneral
BrandLennox
ModelGWB9
CategoryBoiler
LanguageEnglish

Related product manuals