Commissioning
Before switching on
6
40
BA33.0001 EN 2.0
6 Commissioning
6.1 Before switching on
Before the initial commissioning, before commissioning after an extended standstill time
or before commissioning after an overhaul of the motor, you must check the following:
ƒ
Are all screwed connections of the mechanical and electrical parts firmly tightened?
ƒ
Is the unrestricted cooling-air inlet and outlet ensured?
ƒ
Are the protective devices against overheating (thermal sensor evaluation) effective?
ƒ
Is the drive controller correctly parameterised for the motor?
(
E
Drive controller operating instructions)
ƒ
Are the electrical connections o.k.?
ƒ
Does the motor connection have the correct phase sequence?
ƒ
Are rotating parts and surfaces, which can become very hot, protected against
touching?
ƒ
Is the permanent lubrication connected?
Danger!
Built-in brakes are not fail-safe brakes!