6
lci1.com 574 - 537- 890 0 Rev: 11.16.18
Solera
®
Classic Awning
Installation and Owner’s Manual
(For Aftermarket Applications)
CCD-0001254
3. Use a screwdriver to spread open either end of the awning rail
on the installation side (Fig.7A).
4. To protect the fabric from damage during installation, le any
sharp edges or burrs from the awning rail channel.
5. Spray the inside of the awning rail channel (Fig.7B) with silicone
lubricant.
6. Remove the packaging from the fabric. Unroll a small portion of
fabric, but not more than one rotation of fabric.
NOTE: The next step will require three people: One to feed the
polycord into the awning rail channel; two to walk the support
arm assemblies along the awning rail while the fabric slides into
position.
7. Slide the polycord into the awning rail channel and walk the
support arm assemblies and fabric down the awning rail channel
until the support arm assemblies are in line with the previously
made centerline marks.
8. Lift the support arm assembly up and secure the feet into the
previously installed bottom mounting brackets by pressing the
lever and opening the latch (Fig.8).
9. Center the upper mounting brackets on the previously marked
centerline of the support arm assembly centerline.
A. Arrange the upper mounting brackets to straddle the
awning rail.
B. Tighten the black locking knob on the mount arm upper
channel (Fig.6, Channel #3).
NOTE: If adjustments are needed so the upper mounting
brackets straddle the awning rail, loosen the black locking knob
on the mounting arm’s upper channel (Fig.6, Channel #3).
Slide the mounting arm upper channel (Fig.6, Channel #3)
up or down as needed over the mounting arm’s lower channel
(Fig.6, Channel #4).
Fig.7
A
B
Push To Open
Fig.8