CONFIRMATION AND CHANGE OF ACTIVE CHANNELS
After performing the calibration and verifying that the system works properly, you can confirm the
channels automatically detected by the instrument; in this way, in case of accidental interruption of
the cable of one or more load cells, the instrument displays the  alarm.
 (default): confirmation is requested (),press to proceed or press to cancel.
The display shows the number of channels automatically detected by the instrument, press to
confirm and save the current selection or press to exit with no change.
 confirmation is requested (),press to proceed or press to cancel. Press
or to select the channel, confirm with and press or to activate ()or deactivate it
(); press to save the current selection and exit.
After editing, you must repeat equalization, zero setting and calibration using a sample
weight.


+



Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Load Cell Systems TLB4 and is the answer not in the manual?

Load Cell Systems TLB4 Specifications

General IconGeneral
BrandLoad Cell Systems
ModelTLB4
CategoryTransmitter
LanguageEnglish