EasyManuals Logo
Home>Manitowoc>Ice Maker>CVD1475

Manitowoc CVD1475 User Manual

Manitowoc CVD1475
204 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #41 background imageLoading...
Page #41 background image
–31–
Q1400C/SU1000C
1. Check the water level while the ice machine is in
the Clean mode and the water pump is running.
The correct water level above the water pump
impeller housing is:
Q1400C - 1/8-1/2 in. (3-12.5 mm)
SU1000C - 1/8-1/4 in. (3-6.35 mm)
2. The float valve is factory-set for the proper water
level. If adjustments are necessary:
A. Loosen the two screws on the float valve
bracket.
B. Raise or lower the float valve assembly as
necessary, then tighten the screws.
If further adjustment is required, carefully bend the
float arm to achieve the correct water level.
WATER
LEVEL

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc CVD1475 and is the answer not in the manual?

Manitowoc CVD1475 Specifications

General IconGeneral
BrandManitowoc
ModelCVD1475
CategoryIce Maker
LanguageEnglish

Related product manuals