EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove GMK 5250L

Manitowoc Grove GMK 5250L Maintenance Manual

Manitowoc Grove GMK 5250L
354 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #136 background imageLoading...
Page #136 background image
Maintenance work on the carrier
7.8 Angle gear
7 - 60 3 302 744 en Maintenance manual
GMK5250L
09.03.2018
• Tighten the filter (4).
• Remove the connecting piece and hose
from the valve (3) – the valve (3) is closed.
• Fill the oil up to the lower edge of the open-
ing (1).
• Fit a new gasket and tighten the screw (1).
• Close the valve – lever (2) at right angles to
the line.
Inspections after
the oil change
In order to circulate the oil around the oil circuit you must try out operation
of a hydraulic function on the superstructure (for instance tilting the crane
cab).
• Switch the engine off and wait for approx. 5 minutes.
• Check the oil level; à p. 7 - 54.
• Check the angle gear, the filter and the oil cooler for leaks.

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals