EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove GMK 5250L

Manitowoc Grove GMK 5250L Maintenance Manual

Manitowoc Grove GMK 5250L
354 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #241 background imageLoading...
Page #241 background image
Maintenance work on the superstructure
8.3 Hoists
09.03.2018
Maintenance manual 3 302 744 en 8 - 13
GMK5250L
8.3.5 Having a partial inspection carried out
Only suitably trained specialists should carry out a partial inspection of
– the multiple-disc brake,
– the plug connections between the hydraulic motor and the multiple-disk
brake,
– the plug connections between the multiple-disk brake and transmission
unit
and be permitted to exchange parts with signs of wear.
8.3.6 Having a general inspection carried out
H
When carrying out the general inspection of the hoists, also observe the
information contained in
Measures required for winch monitoring, p. 5 - 21.
The general inspection involves removing the transmission and sending it
to the manufacturer to be examined.
H
For transmissions that have undergone a general overhaul, an oil change
must be carried out after 200 and 1000 operating hours;
à Run-in regula-
tions
, p. 4 - 1.
Y 3
Y 6

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals