Maintenance work on the superstructure
8.7 Main boom
8 - 54 3 302 744 en Maintenance manual
GMK5250L
09.03.2018
Before checking
• Telescope the telescopic section I to 56%
and mechanically lock the telescopic section
I in the basic section; à Operating manual.
• Pull the telescoping cylinder back;
à Operating manual.
• Switch the engine off and secure against
unauthorised use of the truck crane.
• Secure yourself to prevent yourself from
falling.
• Remove the cover (1) – the pressure
accumulator is present on the telescoping
cylinder (2).
Checking • Have pressure testing performed; à p. 8 - 53.
After checking
• Secure yourself to prevent yourself from
falling.
• Fasten the cover (1).
• Start the engine.
• Retract the telescopic section I to 0% and
mechanically lock the telescopic section
I in
the basic section;
à Operating manual.

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals