EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove RT770E

Manitowoc Grove RT770E User Manual

Manitowoc Grove RT770E
174 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #157 background imageLoading...
Page #157 background image
Grove Published 04-04-2017, Control # 446-09 5-25
RT770E OPERATOR MANUAL LUBRICATION
5
Item
Lube Point
Description
Figure
No.
Approved
Lubricant
Lube
Capacity
Lube
Interval
Application
Boom
Operation
Mode and
Length
Boom (continued)
75A
Boom Tele 1
Section Lower
Front Upper and
Lower Wear
Pads
Figure 5-9
EP-MPG
Extreme
Pressure
Multipurpose
Grease
6829003477
Thoroughly
coat all
areas the
wear pad
moves on
50 hours or
1 week
•8 Points
24 places
by brush
Spread
grease on
the outside
of Tele 1,
2, 3, & 4 in
the area
that the
wear pads
move on
•[B] 18.7m
(61.4 ft)
75B
Boom Section
Lower Front and
Upper Front
Wear Pads
Thoroughly
coat all
areas the
wear pad
moves on
50 hours or
1 week
•[A] 34.2m
(112.5 ft
NOTE: Lubricate items more frequently than interval indicated in table if environmental conditions and/or operating
conditions necessitate.
76a
Extend Cable
Sheaves
Figure 5-9
EP-MPG
Extreme
Pressure
Multipurpose
Grease
6829003477
Until
grease
extrudes
250 hours or
3 months
2 grease
fittings
Extend
Tele 1
approx. 3 ft
for access
through
Tele 3 and
Tele 4
holes
•[B] 12m
(39.4 ft)
76b
Extend Cable
Sheaves
Figure 5-9
Until
grease
extrudes
250 hours or
3 months
4 grease
fittings
Extend
Tele 2
approx. 3 ft
for access
through
holes
•[A] 12.8m
(42 ft

Table of Contents

Other manuals for Manitowoc Grove RT770E

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove RT770E and is the answer not in the manual?

Manitowoc Grove RT770E Specifications

General IconGeneral
BrandManitowoc
ModelGrove RT770E
CategoryConstruction Equipment
LanguageEnglish

Related product manuals