Aids in engine installation by acting as a
template for engine mounting holes.
2. Drill four 13.5 mm (17/32 in.) mounting holes.
3973
Lifting Outboard
1. Remove the top cowl.
2. Install the lifting base to the flywheel using three bolts. Tighten the bolts
securely.
3. Thread the lifting eye into the lifting base.
4. Connect a hoist that has a minimum lift capacity of 450 kg (1000 lb) to the
lifting eye.
OUTBOARD INSTALLATION
eng 109