refrigeration plate, lamp cable and the connection cable of analogue board. If
necessary, you can disconnect the connection of some cables in advance.
2 Replacement of the peristaltic pump should be followed with flow volume
calibration (this is not for system configured with cuvette). Please refer to the
operator’s manual for details.
3 Wear antistatic gloves to replace the hardware board.
WARNING
When the enclosure is opened, do not touch the boards, sockets, switch
and etc, when the system is powered on, otherwise, electric shock might
occur.
3.2.6 Enclosure Assembly
3.2.6.1 Introduction
The enclosure assembly supports and fixes the touchscreen, recorder, aspirate
button, other input and output components and etc. Optical window cover and lamp
replacement window cover are designed to facilitate the replacement of flow cell,
cuvette and lamp.
3.2.6.2 Components and Structure
The basic structure of the enclosure assembly is shown as figure 3-13.
Figure 3-13 Enclosure assembly structure