INSTALLING MIVOICE MX-ONE HARDWARE, OVERVIEW
11 6/1531-ASP11301 Uen T2 2015-04-23
4 INSTALLATION PREPARATION
The site is prepared mostly during the site planning stage, as described in the environ-
mental spec for MX-ONE SITE PLANNING. Should these preparations not be
complete, perform the following steps before starting the installation:
1. Mark where to position the equipment and where to mount wall supports (if
required).
2. Drill holes for anchoring the rack to the floor (use the rack and the tip protection
as a template).
3. If necessary, make holes for the running of cables between rooms.
4. If required, set up cable chutes in the site.
5. Clean the room before unpacking the equipment.
6. Check that needed tools are available. For more details, see installation instruc-
tions for Installation preparation and Earthing
7. Check that ESD-straps are available. For more details, see installation instruc-
tions for Installation preparation and Earthing
4.1 UNPACKING
Check that you have received all part and products according to the delivery slip.
Be careful when open the packing, so no parts are damaged by sharp tools.
Secure that no parts remains in the packing
Recycle the packing material according to local recommendations.
For more details about Installation Preparation, see installation instructions for Instal-
lation preparation and Earthing.