EasyManuals Logo
Home>NEC>Switch>2400

NEC 2400 User Manual

NEC 2400
168 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #50 background imageLoading...
Page #50 background image
4-8 Issue 2 December 1995
Hardware Installation
Connect the Null Cable and the
Y-Cable to the SID
The AT&T installation technician, the customer, or the customer’s switch
technician must complete this task.
The NEAX 2400 switch communicates with the SID through a Message Center
Interface (MCI) link. To connect the SID to the MCI digital port, you must connect
a Null cable and a Y-cable to the SID. Use the following instructions to connect
the cables to the SID.
1. Connect one end of the Null cable to the 25-pin Link B on the SID, shown
in Figure 4-3.
2. Connect Port 0 of the Y-cable to the free end of the Null cable.
NOTE
:
Port 1 on the Y-cable is not used for any connections with this
integration.
Proceed to the next section.
Figure 4-3. Back View of the SID
25 Pin 25 Pin
(Fan Outlet)
Link A Link B
Diag Net B Net A Line B Line AModem
115-230V AC
50/60 Hz
Power
Cord
Outlet
(Male)
Power
Switch

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the NEC 2400 and is the answer not in the manual?

NEC 2400 Specifications

General IconGeneral
BrandNEC
Model2400
CategorySwitch
LanguageEnglish

Related product manuals