After the above checks and adjustments have been made, the sys-
tem can be tested.
!
experienced personnel who must establish what tests to per-
form based on the risks involved.
Testing is the most important part of the whole automation process.
Each single component, e.g. motor, emergency stop, photocells,
etc.,mayrequireaspecictestphase;pleasefollowtheprocedures
described in the operating instructions for each component.
To test the control unit, perform the following operations:
1. Function selection:
•Set Dip Switch 1 to ON (Semi-automatic operation) and the
remaining ones to OFF
2. Press the Open button and check that:
•theashinglightisactivated
•theopeningmanoeuvrestarts
•themovementstopswhentheopeninglimitstopisreached.
3. Press the Close button and check that:
•theashinglightisactivated
•theclosingmanoeuvrestarts
•themovementstopswhentheclosinglimitstopisreached.
4. Start an opening manoeuvre and make sure that during the
manoeuvre the triggering of a device:
•connectedtothe“Stop”inputcausesanimmediatestopanda
short reverse run
•connectedtothe“Photo”inputhasnoeffect.
5. Start a closing manoeuvre and make sure that during the
manoeuvre the triggering of a device:
•connectedtothe“Stop”inputcausesanimmediatestopanda
short reverse run
•connected to the “Photo” input causes the stop and subse-
quent reversal of the manoeuvre
•connectedtothe“Photo1”inputcausesthestopandsubse-
quent reversal of the manoeuvre.
6. On the connected inputs, make sure that each activation of the
input generates a step in the following sequence:
•Step-by-stepinput:Sequence=Open–Stop–Close–Stop
•Openinput:Sequence=Open–Stop–Open–Stopp
•Closeinput:Sequence=Close–Stop–Close–Stop
7. Ifthe“Phototest”functionisused,checktheefciencyofthetest:
•Interrupt the “Photo” photocell, then start a manoeuvre and
check that it is not performed
•Interrupt the “Photo1” photocell, then start a manoeuvre and
check that it is not performed
•Short the “Photo” photocell contact, then start a manoeuvre
and check that it is not performed
•Shortthe“Photo1”photocellcontact,thenstartamanoeuvre
and check that it is not performed
8. Perform the tests for measuring the Impact Forces as required by
EN 12445.
If after the completion of the testing process additional functions are
activatedwhichcouldaffectthesafetyofthesystem,specictesting
of these functions must be performed.
6) Testing
6.1) Commissioning
Commissioning can take place only after all the testing phases of the
control unit and the other devices have been completed successfully.
It is not permissible to execute partial commissioning or to enable
use of the system in makeshift conditions.
1. Prepare and store for at least 10 years the technical documenta-
tion for the automation, which must include at least the following:
assembly drawing of the automation, wiring diagram, analysis of
hazards and solutions adopted, manufacturer’s declaration of
conformityofallthedevicesinstalled(forA60usetheannexed
CEdeclarationofconformity);copyoftheinstructionmanualand
maintenance schedule of the automation.
2. Afx a dataplate on the gate providing at least the following
data:type of automation, name and address of manufacturer
(personresponsibleforthe“commissioning”),serialnumber,year
ofmanufactureand“CE”marking.
3. Post a permanent label or sign near the gate detailing the opera-
tions for the release and manual manoeuvre.
4. Prepare the declaration of conformity of the automation system
and deliver it to the owner.
5. Preparethe“Instructionsandwarningsfortheuseoftheautoma-
tionsystem”anddeliverittotheowner.
6. Prepare the maintenance schedule of the automation system and
deliverittotheowner(thismustprovidealldirectionsregarding
themaintenanceofthesingleautomationdevices).
7. Before commissioning the automation system inform the owner in
writingregardingresidualrisksandhazards(e.g.inthe“Instruc-
tionsandwarningsfortheuseoftheautomationsystem”).