EasyManuals Logo
Home>Omron>Network Hardware>E2E series

Omron E2E series User Manual

Omron E2E series
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #33 background imageLoading...
Page #33 background image
7
IO-Link Connection Procedure
30
7.6. IO-Link Communication Status Check
Confirm that cyclic communications in the IO-Link system performs normally.
Checking the Connection Status 7.6.1.
Check the connection status of each device.
1
Check with LED indicators on
Controller that PDO
communications via EtherCAT
performs normally.
The LED indicators in normal status
are as follows:
NET RUN: Green lit
NET ERR: Not lit
LINK/ACT: Yellow flashing
2
Check the LED indicators on
EtherCAT Coupler Unit.
The LED indicators in normal status
are as follows:
RUN: Green lit
TS: Green lit
ERR: Not lit
L/A IN: Green flickering
L/A OUT: Not lit
3
Check the LED indicators on
IO-Link Master Unit.
The LED indicators in normal status
are as follows:
TS: Green lit
1-C: Green lit
1-E: Not lit
4
Check the LED indicator on
Proximity Sensor.
The LED indicators in normal status
are as follows:
Stability indicator /
Communication indicator:
Green blinking
Stability indicator/
Communication indicator

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Omron E2E series and is the answer not in the manual?

Omron E2E series Specifications

General IconGeneral
BrandOmron
ModelE2E series
CategoryNetwork Hardware
LanguageEnglish

Related product manuals