Installation and commissioning
8 - 5
8.02 Initial operation
● Check the machine, in particular the
electrical leads and pneumatic
connection tubes, for any damage.
● Remove pin 1 from the oil reservoir 2.
The pin 1 serves only to protect the
machine from damage during
transportation and must not be used
during sewing.
● Clean the machine thoroughly and oil it,
or top up the oil, see Chapter 10 Care
and Maintenance.
● Have mechanics ensure that the
machine’s motor can be operated with
the available electricity supply and that it
is connected correctly to the terminal
box. If not, the machine must
not not
not not
not be
operated.
● The balance wheel must rotate towards the operator when the machine is running. If
not, have the motor connection changed by a mechanic.
● Connect the machine to the compressed air system. The pressure gauge must display a
pressure of approx. 6 bar. If not, adjust the pressure to this value, see Chapter 10.06
Checking / adjusting the air pressure.
8.03 Switching the machine on / off
● Switch the machine on or off, see Chapter 7.01 On/off switch.
● Carry out a test run.
Fig. 8 - 08
1
2